
Mt Henry
Mt Henry Project is Positioned to Deliver Growth
Project Details
1%NSR on the Mt Henry Gold Project with an option to increase to 2% NSR.
​
The Mt Henry Project is a world-class, Tier 1 gold mine location in Western Australia, 210km south of Kalgoorlie. It features excellent existing infrastructure, including grid power, highway access, and a licensed water supply. As a brownfields site with a granted mining lease and historical 0.82 Moz Measured and Indicated Resource, it offers a shortcut to production, especially with gold trading well above the at the current market price

Location
-
Tier 1 location in Western Australia
-
210km South of regional center of Kalgoorlie
-
“Best” place to build a gold mine in the world
Infrastructure
-
Grid power to tenement boundary
-
Highway Access to project boundary
-
Licensed borefield and water supply in place
Shortcut to Production
-
Brownfields Mine site
-
Granted mining lease with mining as recent as 2017
-
Historical 0.82 Moz Measured and Indicated Resource
-
Resources reported in A$2,160 pit shell- Gold currently trading >A$6,700 to A$7,000 ounce
Mt Henry Gold Deposit
Immediate Resource Growth
-
SIMPLE geometry with consistent mineralisation and broad widths
-
Strong Mineralisation over ~2km of strike
-
SHALLOW drilling depth (max depth 150m)
-
Completely OPEN below the shallow historic open pit
-
Unmined historic drill intercepts point to immediate GROWTH

Mt Henry
Gold [Au]
Project
Project Location
